7-23 Power Package Deliver Path - LynnBlakeGolf Forums

7-23 Power Package Deliver Path

The Golfing Machine - Advanced

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 01-19-2006, 11:55 PM
12 piece bucket's Avatar
12 piece bucket 12 piece bucket is offline
Senior Member
 
Join Date: Jan 2005
Location: Thomasville, NC
Posts: 4,380
7-23 Power Package Deliver Path
I may have screwed up by lifting this out of context. I'm trying to figure out the second paragraph in 7-23:

Normally, Delivery “THRUST” is “Cross Line” – Delivery “MOTION” is “On Line”. Even at Low Point, because Delivery Path Angle (direction) is ALWAYS the alternate Target Line (7-2-3) even with Circle Delivery Path (1-L-9, 1-L-10). Study 7-11 and 7-19.

So here he is saying that Thrust is "Cross Line." And since it is "cross line" are we exclusively talking about Hitting?

Chasing this down a bit via the references . . .

Per 7-2-3, 3.the back of the Flat Left Wrist and the Lag Pressure Point (6-C-2-0) BOTH facing down the Angle of Approach (2-J-3). Otherwise, per 7-3, both must face down the Right Forearm Impact Fix Alignment (Alternate Target Line) regardless of the true Angle of Approach (2-J-3, 7-5).

1-L 9 & 10 . . .

9. Regardless of how the Lever Assembly is driven, it moves in a circle.
10. The Lever Assembly must be driven through Impact by an On Plane force (moving toward the Plane Line).


I'm still lost on this . . . Is the Swinger's Thrust Cross Line based on 7-23 or have I missed the boat?
__________________
Aloha Mr. Hand

Behold my hands; reach hither thy hand
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
7-23 Power Package Delivery Path sustainthelag The Golfing Machine - Advanced 15 11-13-2006 03:57 PM
7-23 Power Package Delivery Path Yoda Chapter 7 2 04-28-2006 10:36 PM
10-24 Power Package Release Yoda Chapter 10 0 04-27-2006 12:04 PM
7-12 Pivot POWER PACKAGE TRANSPORT Yoda Chapter 7 0 04-27-2006 10:44 AM
10-24-0 Power Package Release Yoda Chapter 10 0 04-26-2006 11:16 PM


All times are GMT -4. The time now is 02:13 AM.


Design by Vjacheslav Trushkin, color scheme by ColorizeIt!.